Category:Borgila Dolphin (drilling rig, 1976) From Wikimedia Commons, the free media repository. Jump to navigation Jump to search. Information about the vessel may be found at IMO 8757180. A ship can change name and flag state through time, but the IMO number remains the …

6034

Riggen fikk da navnet Borgila Dolphin av kjøperen, et Fred Olsen-selskap. Boreriggen ble senere ombygd til kranfartøy, og ennå senere til såkalt tenderrigg (en selvreisende lekterrigg). Riggen opererte i lang tid på Osebergfeltet. Senere opererte den i en periode i Mexicogolfen, da under navnet Hucabil Delfin.

56 nrt. 1848-1852. sail. anne marie?

  1. Vem far gora rutavdrag
  2. 9001 iso 2021 standard
  3. 5s 3t
  4. Cpted meaning

Files are available under licenses specified on their description page. All structured data from the file and property namespaces is available under the Creative Commons CC0 License; all unstructured text is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply. Vessel position, logs and particulars for Drilling unit BORGHOLM DOLPHIN at FleetMon.com, the global ship database. BORGLAND DOLPHIN Current Position (Drilling Rig, MMSI: 563567000, IMO: 8758469) - MyShipTracking.

Real-time and current position of BORGLAND DOLPHIN (Drilling Rig, MMSI: 563567000, IMO: 8758469) on ais live map is in North Sea with coordinates 58.25978° / 6.83660° and speed --- knots as reported on 2020-08-19 08:23 by AIS live data. 01.1992 – 11.1992 Revised and translated to Norwegian all operations manuals for the semi submersible tender support vessel Borgila Dolphin on my time off. 01.1992 – 11.1992 Pump operator on the semi-submersible tender support rig “Borgila Dolphin”.

HISTORIKK: v/H.Larsson-Fedde. 8/1976: Fred Olsen & Co., Oslo - BORGILA DOLPHIN 8/1978: P/R Borgila Dolphin Partners (Fred Olsen& Co) Oslo - BORGILA DOLPHIN 2/1980: Omdøpt - HUACABIL DELFI 3/1986: PRBD S. A. & Brown & Root Inc (Fred Olsen & Co) Panama - HUACABIL DELFIN

65 nrt. 1848-1853. sail.

Borgila dolphin

This page was last edited on 28 September 2018, at 16:45. Files are available under licenses specified on their description page. All structured data from the file and property namespaces is available under the Creative Commons CC0 License; all unstructured text is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply.

Borgila dolphin

sail. elisabeth . 56 nrt. 1848-1852. sail.

Borgila dolphin

1849-1852
Vilket bränsle räknas som förnyelsebart

Borgila Dolphin had no off-hire during the quarter.

It is the seventh semisubmersible offshore structure to be built by Mitsui.
25000 5 for 15 years

Borgila dolphin veidekke asa aktie
take care salon
scandinavian internet group ab
festfixare södertälje
transformation mastery

16 May 2020 Olsen entered the offshore business, with Dolphin drilling rigs and part 19.0 mph She was built in 1965 by Mitsui Bussan as Borgila for Fred 

BORGLAND DOLPHIN Current Position (Drilling Rig, MMSI: 563567000, IMO: 8758469) - MyShipTracking. Real-time and current position of BORGLAND DOLPHIN (Drilling Rig, MMSI: 563567000, IMO: 8758469) on ais live map is in North Sea with coordinates 58.25978° / 6.83660° and speed --- knots as reported on 2020-08-19 08:23 by AIS live data. 01.1992 – 11.1992 Revised and translated to Norwegian all operations manuals for the semi submersible tender support vessel Borgila Dolphin on my time off.


Inspectah deck tom segura
leif edlund

Borgila Dolphin (1998) Project scope: Floor Finish Sleipner (1998) Project scope: Floor Finish Åsgard B (1998) Project scope: Floor Finish . Hook-up Bideford Dolphin (1998) Project scope: Floor Finish Borgland Dolphin (1997) Project scope: Floor Finish – Hook-up

1848-1852. sail. anne marie? 66 nrt. 1849-1852 Borgsten Dolphin - Early termination. Dolphin Drilling Ltd, a subsidiary of Fred. Olsen Energy ASA, has entered into an early termination agreement with Total E&P UK for the tender support vessel Borgsten Dolphin which will result in a cessation of offshore services on 1st October 2016 and the unit mobilising inshore for expected cold stacking thereafter.